As for the Prysmian scope, the project was awarded to Prysmian Group in May 2019 by Vineyard Wind, LLC. The contract included the design, manufacture, installation, and commissioning of an HVAC (High Voltage Alternating Current) cable system composed of two 220 kV three-core cables with extrude...