Attach the 12′ long 4×4 pressure treated skids to the bottom of the floor frame. Square out the floor frame by measuring diagonally until both sides measure the same. Secure the 4×4 skids by nailing 3 1/2″ nails through the floor frame and into the 4×4 skids. Cut to size and ...